What's involved
- A survey of your supply, consumer unit and the route to the charger
- A dedicated circuit with its own RCBO, sized for the charger
- Protection against a lost neutral (PEN fault) — built into the charger or added at the board
- Charger mounted where the cable reaches the car without a trip hazard
- Set up on your Wi-Fi or app, scheduling and tariffs explained
- Tested, certified, notified to Building Control and the network operator informed
Choosing a charger
Tethered chargers have the cable attached, which is quicker day to day; untethered ones take any cable, which is better if you might change car or let guests use it. Most homes are best with a 7 kW single-phase unit; three-phase 22 kW is for businesses with the supply to match. Home chargers sold in the UK must be smart — able to schedule and respond to tariffs — so you can charge on the cheap overnight rate without thinking about it.
Holiday lets, landlords and businesses
Guests increasingly filter for places with a charger, and a holiday let with one books more. We fit chargers with pay-per-use or simple guest access, and we can install several on one supply with load management so they share the capacity sensibly. For landlords with a few properties and for small businesses with a van or two, we'll check the supply first and tell you honestly what it can take.
Grants
Government EV charge point grants come and go, and most are now aimed at renters, flat owners, landlords and businesses rather than owner-occupied houses. Ask when you enquire and we'll tell you what's current and whether your property qualifies.
Notifiable work. A new charger circuit is notifiable under the Building Regulations in Wales, and the network operator has to be told about the extra load. Both are handled as part of the job and explained up front.